Movie prime

Vande Bharat Will Be Beautiful From January, Train Will Run in Tunnels For 119 Km

 
Jammu to Srinagar railway line map, Jammu to Baramulla train time table, Srinagar to Jammu train time table, Jammu to Srinagar train price, Jammu-Srinagar train, Jammu-Srinagar railway completion date, Vande Bharat train to Srinagar, Jammu to Srinagar distance

Vande Bharat Train: For your information, let us tell you that the 49th Vande Bharat train started in the country will be different from the rest. Traveling in this train will be a different kind of fun. Travelers feel as if they are traveling in Europe. This train will pass through 38 tunnels and 927 bridges. In this journey of 272 km, more than half the distance will be on tunnels and bridges only. The thrill did not come by reading, that is why this route is called a beautiful journey.

Vande Bharat train, which runs between Jammu and Srinagar. Indian Railways said that the Udhampur-Srinagar-Baramulla railway link is completely ready. On which the country's 49th Vande Bharat train will run. This is the country's first Vande Bharat train. In which there are eight coaches. Electricity will run this 272 kilometer long road. Railways has also completed a 15 km trial run between Banihal and Khari railway stations in Ramban district.

Telegram Link Join Now Join Now

Important update from Railway Minister

Railway Minister Ashwini Vaishnav has given an important update regarding this link. He said that the entire route will be ready by January 2024, due to which Vande Bharat train will start running from Jammu to Srinagar. The Railway Minister has also conducted a trial on the world's highest railway bridge built on this route. A factory has been built in Budgam to repair these trains. And engineers are being given specific training.

Read More - Vivo X90 Pro 5G Smartphone Comes With 6.78 inch Full HD 3D Curved Display & 256GB Storage, Know Price & Features

travel time will be halved

At present the only way to go from Jammu to Srinagar is by road. It takes six to seven hours to cover the distance of approximately 250 kilometres. And in winter it sometimes gets closed due to snow falling. Once the railway route is built, its distance will be 272 km, but the travel time will be only 3.5 hours. That means it will take half the time from today.

Read More - Strong Discount on This Samsung Smartphone, Battery Will Run 2 Days After Full Charge

why is it special

This railway will be counted among the most unique train journeys in the country. This is the biggest reason. That the train will cross about 38 tunnels in the entire route. The length of one of these tunnels (T-49) is 12.75 km. Which is the biggest tunnel of the country. Not only this, there will be 927 bridges on the route, which will total 13 km.

Read More - Get POCO M5 Smartphone With 128GB Storage For Just Rs 9k, Great Offers Being Given

will cross the highest bridge

This is the longest railway bridge in the world. Which is built on Chenab river. Its length is 1,315 meters. And is 359 meters high from the river level. India's first hanging railway bridge. Which is made of cable.

Superfast News Coverage By YuvaPatrkaar.com Team

Publish Date: December 25, 2023

Posted By Sunil

Follow Us on Google News - Click For Latest News

d